Investment projects

The new bulk liquid cargoes complex «IPP» was put into commercial operation in 2002. The terminal facilities handled 2,000 tons cargoes per annum and provided diesel fuel export from Russia.

In 2007 was the second stage of reconstruction: the bunkering fuel transshipment сomplex was successfully put into operation in the «IPP». The project aimed to increase the total volume of cargo turnover through the terminal in amount of 600,000 tons of oil fuel and about 48,000 of diesel fuel tons per annum.

Under the implemented project there were constructed two tanks for oil fuel with the capacity of 5,000 metric tons each, one tank for diesel fuel with the capacity of 1,000 metric tons, a trestle for discharge of oil liquid products. There were also reconstructed births №26А, 26, 27.  

After construction finishing the terminal was equipped with a rapid heating and fuel oil discharge system. Since that time, bunkering operations were carried out by the direct scheme: «tank farm-vessel».

In October 2008 the OJSC «IPP» finished the reconstruction of the terminal for the transshipment of liquid bulk cargoes. New technical facilities could handle about 1 million tons of oil liquid cargoes per annum.

The next stage of modernization was the implementation of the project – «OJSC «IPP» Development (warehouse deport) ». The main objective of this project was the increscent of the current tank farm capacity and reconstruction of the fuel pipeline system in accordance with European ecological standards of safety.

There were built three new tanks with a total capacity of 36,000 tons. The total volume capacity of OJSC «IPP» tank farm increased from 51,000 thousand tons up to 78,900 tons. Owing to new technical facilities, the «IPP» terminal could handle both: diesel fuel and oil fuel.

In 2013 the terminal completed the construction of three universal tanks for diesel fuel with a capacity of 30,000 tons. During the construction of the tanks, the engineers used the latest technology of the “floating roofs” that could help to reduce detrimental atmospheric emissions.

In 2013 the OJSC «IPP» implemented the project of technical modernization of the railroad overpass for fuel oil discharge. That project involved the full equipment replacement with the aim to accelerate the process of draining wagons and improve energy efficiency of the terminal.

Another investment project was the construction of additional oil tank with a capacity of 5000 tons. Thus, the expansion of the tank farm reduced wagons’ demurrage (especially in winter time) and increased maximum tanker lot.

 In 2014 the OJSC «IPP» reconstructed its terminal tank farm. There were built two new tanks with the capacity of 6,000 metric tons each in replacement of two physically worn out tanks, which had been built within 1980-1990. Thus, the newly build tanks has increased the terminal total storage capacity, excluding any economic and ecological risks during operation.

In 2014 the trestle for oil fuel discharge and unloading of dark petroleum products was put into operation. This project aimed to reduce the time required to heat the oil fuel before unloading by means of the technical re-equipment of the railway loading rack’s oil fuel heating system.

The construction of the new tank for the oil fuel with the capacity of 5,000 metric tons expanded the terminal facilities by enabling to provide services for bunkering tankers with oil fuel, according to the customers’ wishes concerning the quality of petroleum products.

In 2016 the OJSC «IPP» will implement another investment project: the reconstruction of the technological pipeline system conveying mineral fertilizers (UAN-32). The current pipeline system will be totally dismantled and replaced by the new one. Thus, the new pipeline system will be fitted out with the latest modern equipment, required to ensure industrial and environmental safety during its exploitation

Management

Alexander Lesnyak

Alexander Lesnyak – General Director


Andrey Zaykov

Andrey Zaykov – First deputy director general


Dmitry Shkorkin

Dmitry Shkorkin – Industrial and Commercial Director – Deputy Director General.


Anton Kucherov

Anton Kucherov – Business support director – Deputy Director General


The key facts

General information on berths

The OJSC “IPP” is a specialized terminal exporting liquid bulk cargoes: diesel fuel, oil fuel and mineral fertilizers (UAN-32).

Berths: No.26А, 26, 27;

The length of the berths No 26, 27 is about 250 m, 26А – about 100 m;

Maximal allowed draft No. 26А – 4,3 m, No. 26 – 12,7 m, No 27 – 11,9 m;

The pipeline system from the terminal to the berths provides for the simultaneous loading of two tankers with diesel fuel, or one tanker with diesel fuel and one tanker with mineral fertilizers/ fuel oil at the berth No. 26 and 27 and one tanker at the birth No 26А.

It is possible to handle tankers with the deadweight up to 56,000 tons. The loading time for the vessels of 30,000 tons is about 36 hours.

The loading speed of diesel fuel is 2,200 tons per hour; oil fuel is 350 tons per hour; mineral fertilizers up to 1000 tons per hour.

The tank farm facilities of the terminal can provide accumulation of two tanker lots of diesel fuel in amount of 30,000 and 35, 000 each, one tanker lot of mineral fertilizers in amount of 35,000-40,000 tons, one tanker lot of oil fuel up to 12,000 tons.

Summary transshipment table (diesel fuel, oil fuel, marine bunker fuel, mineral fertilizers)
Month Diesel fuel Mineral fertilizers (UAN-32) Marine bunker fuel Total
Diesel fuel Oil fuel
Loaded Unloaded Loaded Unloaded Loaded Unloaded Loaded Unloaded Loaded Unloaded
1 quarter 1 380 978 1 378 776 118 864 99 000 15 140 18 689 47 068 50 772 1 562 051 1 547 238
2 quarter 866 599 889 578 186 252 199 877 6 086 5 968 57 886 50 699 1 116 824 1 146 125
First half of 2015 2 247 577 2 268 355 305 116 298 877 21 226 24 658 104 955 101 472 2 678 875 2 693 363
3 quarter 706 289 691 132 217 262 220 601 3 294 3 379 50 875 49 583 977 721 964 696
4 quarter 691 567 708 331 197 539 195 815 40 736 33 819 36 100 35 153 965 944 973 120
Second half of 2015 1 397 856 1 399 463 414 802 416 417 44 031 37 198 86 975 84 737 1 943 665 1 937 816
Total: 3 645 433 3 667 818 719 918 715 295 65 258 61 856 191 931 186 209 4 622 541 4 631 180
Total sum of loaded cargoes: 4 622 541,526 tons
Total sum of unloaded cargoes: 4 631 180,442 tons

Company

IPP

    The Open Joint-Stock Company IPP is located in the north-western part of the city, in the industrial zone, 700 meters to the north-west of (Tsemes) Bay.
Territorially it belongs to the Eastern administrative district of Novorossiysk. It occupies an area of 10 hectares.

     The Open Joint-Stock Company IPP specializes in storage and transshipment of oil products and carbamide-ammoniac compound (UAN). The enterprise provides services of the storage and transshipment of goods from rail tank cars to ships, tank farm, quality and quantity assessment of accepted goods.

    The OJSC IPP has its own complex of operation equipment for export and import of liquid cargoes. The infrastructure for the acceptance and storage of oil products and carbamide-ammoniac compound (mineral fertilizers) includes the system of operation pipelines of the terminal connected with the berth. The operator of the hydro-technical facilities is the Novorossiysk Commercial Seaport (PJSC NCSP).

     Cargo is supplied to the terminal in rail tank cars. The own railway branch lines adjoining to the terminal can accommodate up to 100 wagons simultaneously. Rail tank cars are accepted on the unloading racks capable of handling 74 tanks at the same time, including 42 tanks with diesel fuel, 18 with carbamide-ammoniac compound (mineral fertilizers), 11 – with bunkering fuel. The unloading racks are equipped with discharging facilities and a collector providing for the uniform discharge to the tank farm.

     The capacity of the storage facilities of the enterprise provides the one-time storage of diesel fuel and mineral fertilizers up to 65,000 m³, and bunker fuel – up to 9,000 m³.

     The accredited test laboratory of the OJSC IPP controls the quality of incoming cargo, analyses the main parameters in conformity with the requirements of the state standards, issues certificates of quality for the shipped cargo.

    The cargo is accepted and shipped using automated flow meters of the terminal. The terminal equipment has an automated emergency control system (ECS).

      The shipment is carried out at two special berths of the PJSC NCSP which can accept and handle the tankers with the deadweight up to 47,000 tones and up to 210 m length overall, the vessel’s draft near berth comprising 11,5 m. The ships are loaded by standers and flexible hoses. Tankers’ loading speed is 1,100 tons per hour, the loading period of the tankers of 30,000 tons displacement is 36 hours. The pipeline system from the terminal to the berth provides for the simultaneous shipment of two tankers with diesel fuel or one tanker with diesel fuel and one tanker with carbamide-ammoniac compound.

     The existing technological schemes include cargo handling both with the accumulation of lots in the customs zone tank farm, and the use of the direct variant: vehicle – ship.

Meeting of shareholders

The meeting of shareholders is the supreme authority of the Company.

It makes decisions about the approval of transactions, splitting and reverse splitting of shares, payment of dividends, determines the order of the meeting of shareholders, approves annual reports and internal documents regulating the activity of the Company, elects the members of the Board of Directors of the Returning Board and the Audit Committee, makes alterations and additions in the Articles of the Company. The competence of the meeting of shareholders includes the election of the executive authority of the Company and its early termination.

Thus, the meeting of shareholders has the leading role in the management structure of the Company. 

In its work, the General Meeting of shareholders observes the legislation of the Russian Federation and the Articles of the OJSC «IPP».